Noi Bai International Airport Termination 2 Construction Project


Hanoi, Vietnam

Due to the existing Noi Bai International Airport already surpassing its designed capacity in 2007, the construction of passenger terminal 2 of Noi Bai
international airport which is capable to accommodate 10 million international passengers per annum is one of the most important transport infrastructure projects being implemented in order to contribute to the economic and social development of Hanoi and all Vietnam. BAUER Vietnam Ltd. has been awarded as specialist subcontractor for more than 50 % of foundation works for the main building and the east-wing building consisting of 256 bored piles.

Foundation of the building consists of bored piles with diameter varying from 800 to 1,500 mm and length varying from 25 to 40 m.

Bauer with the appropriate equipment and tools, an experienced site team has also been deployed together with well planning and strong logistics,
managed to complete our whole works including all variations well ahead of the contract schedule helping the Main Contractor to recover their loss time schedule caused by others.


Scope of Works:
256 nos. of Bored Piles ∅ 800, ∅ 1,200, ∅ 1,500 mm