Office Building Mac Dinh Chi


District 1 of Ho Chi Minh City

In order to optimize the available space on the small land plot in the city center, our client decided to push the basement walls as much as possible to the boundary lines. The final design requested for a construction of the retaining walls with only 500 mm distance to the existing buildings. Bauer offered the works based on a new product in Vietnam, a Secant Pile Wall, to ensure safe execution of the works and to guarantee that no damages will occur to the neighboring building.


Scope of Works:
Foundation bored pile and secant pile wall