Oil Rig Production Plant Vung Tau


Vietnam

Drilling through hard materials! After successfully proving our special qualification in rock drilling on previous jobs in Vietnam, PVC-IC awarded us the pre-drilling works for their new plant construction in Baria Vungtau. Bauer drilled through cement soil columns previously installed to strengthen the ground in order to enable subsequent foundation works.


Scope of Works:
261 Nos. predrilling points ∅ 800 mm to a depth of 10 m in sandy soils improved by means of soil-cement columns