Foundation Contractor: BAUER Vietnam Limited Construction Period:20th September 2010 to 1st December 2010 Scope of Works:• 50 Bored Piles Ø 800 mm, depth 38 m• 23 Bored Piles Ø 1,000 mm, depth 3 8m• 3,100 m2 Diaphragm Wall, 600 mm
Main Equipment: 1 nos BAUER BG 40