The Everich II Project


Ho Chi Minh City, Vietnam

The Everrich II Project in District 7 is currently one of the milestone setting projects in Ho Chi Minh City. Modern architecture, innovative concept and the clients’ commitment to high quality are some of the key points. The varying heights of the building together with the particular difficult soft soil conditions requested for a deep foundation solution. Bauer was awarded the project after a massive testing program confirming the design assumptions in a competitive tender. The Client has requested for a particular fast schedule. Bauer carried out the works with 3 nos high performance BG drill rigs type BG 40. A total number of 270 employees were working for Bauer on site in day- and nightshift. Bauer was able to complete the works, including additional works, 2 works before schedule.

 

Scope of Works:
• Pile Test Program consisting of 4 Osterberg Pile Test and 5 conventional Pile Tests

• 406 nos of Bored Pile ∅ 1,000 – 2,000 mm, depth of 60 to 95 m

• Shaft Grouting for 57 nos Bored Piles and Installation of Kingposts in 127 nos Bored Pile